Stir Stick Bridge Challenge
Build strongest bridge using limited stir sticks and tape; test load capacity.
45 minMess: 2/5Engineering Design
Safety notes
Handle sticks carefully to avoid splinters.
Step-by-step instructions
- Define the challenge: Build a bridge that spans a gap (between two cups or tables) using only the provided stir sticks and masking tape.
- Plan your design: Sketch your bridge design. Consider: What shape will be strongest? (triangle, arch, beam) How will you use the sticks?
- Build your bridge: Construct your design using stir sticks and tape. You have limited materials - use them wisely!
- Test the span: Place your bridge across the gap. Does it hold its own weight? If not, redesign and rebuild.
- Test load capacity: Add weight gradually (coins, small objects, or a cup with water). Add weight until the bridge fails or reaches maximum capacity.
- Record results: Measure how much weight your bridge held. Compare with other teams' bridges.
- Analyze: What design features made bridges stronger? (triangles, supports, tape placement) What caused failures?
- Redesign: Based on your test and observations, improve your bridge design. Test again if time allows. Discuss: What engineering principles did you use?
Materials you need
- Craft/Stir Sticks
- Masking Tape
- Clear Plastic Cups (9–12 oz)
Big ideas
- Systems & Models
- Variables & Fair Tests
Topic areas this project explores
- Engineering DesignDefining problems, designing solutions, testing prototypes, optimizing designs, and the iterative engineering process.