Skip to main content
← All projects

Stir Stick Bridge Challenge

Build strongest bridge using limited stir sticks and tape; test load capacity.

45 minMess: 2/5Engineering Design

Safety notes

Handle sticks carefully to avoid splinters.

Step-by-step instructions

  1. Define the challenge: Build a bridge that spans a gap (between two cups or tables) using only the provided stir sticks and masking tape.
  2. Plan your design: Sketch your bridge design. Consider: What shape will be strongest? (triangle, arch, beam) How will you use the sticks?
  3. Build your bridge: Construct your design using stir sticks and tape. You have limited materials - use them wisely!
  4. Test the span: Place your bridge across the gap. Does it hold its own weight? If not, redesign and rebuild.
  5. Test load capacity: Add weight gradually (coins, small objects, or a cup with water). Add weight until the bridge fails or reaches maximum capacity.
  6. Record results: Measure how much weight your bridge held. Compare with other teams' bridges.
  7. Analyze: What design features made bridges stronger? (triangles, supports, tape placement) What caused failures?
  8. Redesign: Based on your test and observations, improve your bridge design. Test again if time allows. Discuss: What engineering principles did you use?

Materials you need

  • Craft/Stir Sticks
  • Masking Tape
  • Clear Plastic Cups (9–12 oz)

Big ideas

  • Systems & Models
  • Variables & Fair Tests

Topic areas this project explores

  • Engineering Design
    Defining problems, designing solutions, testing prototypes, optimizing designs, and the iterative engineering process.

Download as PDF

Save this project to print or use offline.

Share this project